Recent Projects - Natural Gas Power Plant Powered with Step up and Step Down Transformers

Five OLSUN MV Substations were shipped to a new natural gas-fired electrical generating facility (power plant) in The Great Plains. The plant will provide electrical power to oil and gas extraction equipment located throughout the region. Olsun provided two step down transformers and three step up transformers for this project.

The step up transformers are connected to the generators and the step down transformers are connected to the equipment on the company owned electrical distribution system.

Olsun has recently upgraded eight-stage baked-on powder coat paint system was put to good use on this transformer project as the customer specified a custom color for the enclosures.

FEATURES:

Power Distribution Transformer (Quantity: 2):

  • Power: 1500 kVA
  • K Factor: 1
  • Primary Volt: 13800D
  • Secondary Volt: 480Y/277 X 208Y/120
  • Copper Wound, VPI Coils
  • NEMA 3R Floor Mount Substation Enclosure with Base Cover Plate
  • Air Terminal Chamber for Primary with Surge Arrestors
  • Air Terminal Chamber for Dual Secondary with Current Power Transformers Wired to Terminal Block
  • Cold Rolled Steel with Custom Covert Green Powder Coat Finish

Unit Substation Transformer with Load Interrupter Switch (Quantity: 3):

  • Power: 2000 kVA
  • K Factor: 1
  • Primary Volt: 480Y
  • Secondary Volt: 13800D
  • Aluminum Wound, VPI Coils
  • NEMA 3R Floor Mount Substation Enclosure with Base Cover Plate
  • Primary Coupled to 600 Amp, 15kV Load Interrupter Switch with Surge Arrestors
  • Air Terminal Chamber for Secondary
  • Cold Rolled Steel with Custom Covert Green Powder Coat Finish